更新时间:10-16 (我的男朋友)提供原创文章
摘要:本设计是水电厂电气部分设计。该水电厂设计水头6.1m,最大水头10.0m,最小水头3.0m,设计流量390。开发方式为坝后式,装机容量为20MW,发电机组2台。高压侧为110Kv,一回出线与系统相连,其最大输送功率为50MW,该电厂的厂用电率为0.6%。设计年利用小时数为5000小时,年发电量接近1亿度.根据一次部分的参数,在对水电厂一次系统分析的基础上,对水电厂的配电装置布置、防雷保护、继电保护做初步简单的设计。
毕业设计的过程是一次将理论与实际相结合的初步过程,起到学以致用,巩固和加深对电气工程及其自动化专业的理解,树立工程设计的观念,提高电力系统设计能力的作用。
关键词:配电装置布置;防雷保护;继电保护
Abstract"This design is part of the design of electrical hydropower plants. The hydropower plant design head 6.1m, maximum head of 10.0m, minimum head 3.0m, design flow 390. Development methods for the dam toe, installed capacity of 20MW, 2 sets of generators. High side for the 110Kv, a return outlet connected to the system, the maximum transmission power of 50MW, the plant's auxiliary power consumption rate of 0.6%. Designed annual utilization hours is 5,000 hours, annual power output close to 1 million degrees. According to the first part of the parameters, a system of hydropower plant based on the analysis of hydropower's distribution equipment layout, lightning protection, following the Power protection with a simple preliminary design. Graduation is a process designed to combine theory with practice, the initial process of play apply their knowledge to consolidate and deepen the electrical engineering and automation of the understanding, foster the concept of engineering design to improve the role of power system design capability.
Key words: Switchyard; lightning protection; relay
电力工业是国民经济发展中最重要的基础能源产业,是国民经济的第一基础产业,是关系国计民生的基础产业,是世界各国经济发展战略中的优先发展重点。作为一种先进的生产力和基础产业,电力行业对促进国民经济的发展和社会进步起到了重要作用。与社会经济和社会发展有着十分密切的关系,它不仅是关系国家经济安全的战略大问题,而且与人们的日常生活、社会稳定密切相关。随着中国经济的发展,对电的需求量不断扩大,电力销售市场的扩大又刺激了整个电力生产的发展。
随着我国经济的不断发展,对能源的需求量越来越大,然而能源的不足与需求之间的矛盾在近几年不断恶化,国家急需电力事业的发展,为我国经济的发展提供保障。就我国目前的电力能源结构来看,我国主要是以火电为主,但是火电由于运行过程中污染大,在煤炭价格高涨的今天,火电的运行成本也较高,受锅炉和其他火电厂用电设备的影响,其资源利用率较低,一般热效率只有30%-50%左右。与之相比水电就有很多明显的优势。因此,关于电力系统水电厂设计方面的论文研究就显得格外重要。