更新时间:01-06 (雨橙)提供原创文章
摘要:本工程为XX学院第一实验楼,项目所在地为重庆市虎溪大学城,建设单位为XX学院,工程由大地建筑事务所(国际)设计,并且施工图纸齐全。工程概况:该工程共6层,建筑面积7290平方米,基础结构为人工挖孔桩基础。框架结构,耐火等级为二级,抗震设防烈度为六度,使用年限50年,工程类别为三类。
该投标文件的编制是以XX学院第一实验楼的施工合同以及施工设计图纸,现行国家有关设计规范和我市现行的一系列施工和技术规范、标准等为依据。该施工组织针对本工程的地方性及环境特点、工期要求,提出科学合理可行的保证措施并加以重点阐述。以坚持科学的基本建设程序和施工顺序为理念,科学合理安排施工顺序和施工计划,确保工程施工进度。并拟定本工程工期为180个日历天。
由于工期紧工程量较大,为使新的实验楼更快地投入使用,我方保证,一旦中标,将会全面调度公司的人、财、物,积极推广应用新技术、新工艺、新材料、新设备,严格按照科学严谨的施工管理体系运行。贯彻施工技术规范、操作规程,实施全面质量管理。精心组织、科学管理,确保实现各项承诺目标。
关键词:管理 成本 科学合理 施工技术
ABSTRACT:This project is the first Chongqing University of Science and Technology laboratory building, is located in University City of Chongqing. The project construction units of Chongqing Institute of Technology, Engineering from the earth Architects (International) design, construction drawings are complete. Infrastructure uses a hand-dug pile foundation. Frame structure, fire resistance rating of two, six degrees of earthquake intensity, engineering class into three categories.
The preparation of tender documents, Chongqing Institute of Technology is the first laboratory building construction contracts and construction design drawings, national and local construction and the existing series of technical specifications, standards-based, the construction for the local engineering and environmental characteristics, project requirements, to ensure reasonable and feasible measures to focus on. Adhere to the scientific order the capital program and construction, the use of sub-network technology, stratified flow process, a reasonable construction of the order of arrangement and construction plans to ensure that the construction schedule, the project construction period for the development of 180 calendar days.
Due to the volume of construction works bear a larger group of students for the new University City early arrival, our once successful, comprehensive scheduling the company's human, financial, and material, and actively promote the use of new technologies, new processes, new materials, new equipment, strict run in accordance with the ISO9002 quality system. Carry out the technical specifications of construction, and operation procedures, the implementation of total quality management. Careful organization, scientific management, to ensure that the commitments to achieve the goal.
Keywords: Management Cost Scientific and reasonable Construction technology