更新时间:02-02 (单旅寂人)提供原创文章
摘要:重庆科技学院教工宿舍D栋工程为重庆市重点建设工程,本工程位于重庆市渝北区空港新城同茂大道和秋城大道相交处西北侧,同时也位于轨道交通五、十号线交汇处的西北侧,即重庆空港新城两路组团。大楼在形式与体量上和周边相互呼应,形成空港新城地区标式建筑。工程为集娱乐、餐饮、会议及办公等综合性功能的办公大楼;建设规模大,设计定位高,采用了多项先进合理的施工新技术。工程建设伊始,业主、设计、监理以及承建方就将“精品工程”作为工程目标进行实施,并提出了安全目标确保“市标化”,争创“巴渝杯”,质量目标确保“三峡杯优质结构工程奖”,力争国家优质工程金奖“鲁班奖”的口号。
精品工程创建需要从策划、过程实施、总结提炼全过程进行控制。其中技术和质量是两个主要的内容。开展技术创新是精品工程水平不断提升的动力,是建筑企业的核心竞争力;确保质量创优是工程建设的直接目标,是建筑企业立信于社会的重要基石。
本工程建筑总面积约10万m2。其中四层地下室约4万 m2、裙楼约1.6万 m2、1号主楼(6~34F、机房层、水箱层)约4.4万m2。本工程属一类高层建筑,最大建筑高度(地上/地下):163.8m/-17.2m;最大建筑层数(地上/地下):36F/-4F;层高分布为:-2F至-4F层高为3.9m、-1F层高为5.5m、11F及22F层高为5.4m、其余层层高均为4.5m。本建筑主要结构体系为框架核心筒结构,建筑主体结构合理使用年限为50年。
关键词:工程概况 编制依据 工期
ABSTRACT:Chongqing institute of technology faculty in dorm D building engineering for construction projects in chongqing, the project is located in chongqing YuBeiOu airport new town with alum west avenue and fall city avenue intersect, and is located at the junction of the metro line 5, 10, namely chongqing airport new town road group. Building on the form and dimension and surrounding mutual echo, form scale building airport new town area. Engineering for entertainment, catering, conference and office of the comprehensive function such as office buildings; Design construction scale is big, high positioning, using a number of advanced and reasonable construction of the new technology. At the start of project construction, the owner, design, supervision, and main backer would \"quality engineering\" as the engineering target for implementation, and put forward the security objectives to ensure that the \"city scale\", strive for \"bayu cup\", the quality objectives to ensure the high quality structural engineering award \"\" three gorges cup, strive for national high quality project award\" luban prize \"slogan.
High-quality goods project created from the process of planning, implementation, summary refining process control. The technology and quality are the two main content. Technology innovation is the high-quality goods project levels rising power, is the core competitiveness of construction enterprise; To ensure the best quality is the direct target of engineering construction is the cornerstone of building enterprise lixin in society.
The project total construction area of about 100000 m2. Four layers of basement of about 40000 m2, is about 16000 m2, 1 skirt building the main building (6 ~ 34 f, room layer, water layer) of about 44000 m2. This project belongs to the kind of high-rise building, the maximum building height (the floor/ground) : 163.8 m / 17.2 m; Biggest building layers (the floor/ground) : 36 f / 4 f; The height distribution is: to - 4-2 f f the height of 3.9 m and 1 f the height of 5.5 m and 11 and 22 f f the height is 5.4 m and the rest of the layers of high is 4.5 m. This buildings main structure as the framework core tube structure, building the main structure reasonable use fixed number of year for 50 years.
Keywords: Project Overview;Prepared in accordance with;Period