更新时间:02-10 (单旅寂人)提供原创文章
摘要:本工程为重庆城市管理职业学院宿舍楼Ⅰ标段投标文件,所在地为重庆沙坪坝区虎溪镇大学城。该工程的建设单位为重庆城市管理职业学院,工程由重庆大地建筑事务所设计,施工图纸齐全。基础结构采用人工挖孔桩基础,上部主体为砖混,局部框架结构,结构安全等级为二级,抗震设防烈度为六度,建筑抗震设防类别为丙类,工程类别为四类。
该投标文件的编制是以重庆城市管理职业学院宿舍楼I标段施工设计图纸为依据,国家标准和重庆本地方现行的一系列施工和技术规范、标准等为依据,该施工组织针对本工程的地方性特点,如夏季高温、5.6月多雨等环境特点,故对工期要求较紧,我方承诺:我方一旦中标将全面高度集中公司的人、财、物等积极参与施工,确保新一批学生能及时入住学校。因此我方提出合理可行的各种保证质量、确保安全及按时完成任务的合理工期的措施加以重点阐述,坚持科学的基本建设程序和施工顺序,运用网络分段技术、分层流水作业,合理安排施工顺序和施工进度计划,确保施工进度及质量要求,本工程拟定工期为163个日历天。
本工程将积极推广应用“四新技术”即新技术、新工艺、新材料、新设备,严格按照ISO9002质量体系运行。精心组织、科学管理,认真贯彻施工技术规范、操作流程要求,实施全面质量管理,成本管理,进度管理,确保实现各项承诺目标。
关键词:工程概况 进度 质量 安全 措施
ABSTRACT:This works for the Chongqing city management staff dormitory Career Academy contract bidding documents, is located in Chongqing city Shapingba District Huxi town university.The project construction units for the Chongqing City Administration of Career Academy, works by the Chongqing earth building firm to design, construction drawings complete。Basic structure of the manual hole digging pile foundation, the upper body brick, partial frame structure, structural safety grade two level, seismic fortification intensity is six degrees, building earthquake-proof category C, the project categories into four categories.
The preparation of the bidding documents is to the construction contract management of Career Academy in Chongqing city staff quarters and construction design drawings, standards and the Chongqing local party present a series of construction and technical specifications, standards and so on as the basis, The construction organization according to the local characteristics of the project, such as high temperature in summer, 5.6 month rainy environment characteristics, the time limit for a tight, Our commitment: our party once the successful bidder will be highly focused companies people, wealth, and actively participate in the construction, ensure that the new batch of students can be in school。So we put forward the reasonable period of reasonable and feasible to ensure quality, ensure safety and finish the task on time measures to focus on, adhere to the basic construction procedures and the construction sequence of science, segmentation, hierarchical assembly using the network, reasonable arrangements for the construction sequence and the construction schedule, to ensure that the construction schedule and quality requirements, the project development period 163 calendar days.
This project will actively promote the use of "four new" new technology, new technology, new materials, new equipment, in strict accordance with the ISO9002 quality system operation. Meticulous organization, scientific management, earnestly implement the construction technical specification, operation flow, the implementation of total quality management, cost management, schedule management, to ensure the implementation of the commitments.
Keywords: engineering;measures;schedule;quality;safety